Home Renovations in Rockcliffe Park
The whole former village of Rockcliffe Park is a heritage conservation district. We renovate its homes with the heritage permit planned from the first drawing.
Home Renovations in Rockcliffe Park, With Heritage in Mind
Rockcliffe Park homeowners are often renovating a house they intend to keep for a long time. They want a kitchen and bathrooms that work for today, and a house that still looks like it belongs on the street. Home renovations in Rockcliffe Park have to do both.
The entire former village is a heritage conservation district under By-law 97-10, so a heritage permit is needed before altering or demolishing. As a design-build renovation company, we plan the design and the heritage application together, so the approval is part of the schedule instead of a delay.
- One team from design to final inspection
- City permits and inspections handled
- 3D design before construction
- A fixed price and a 7-year warranty

What We Renovate in Rockcliffe Park
Whatever the project, home remodeling in Rockcliffe Park runs through the same team and the same fixed-price contract. Pick the project closest to your plans.
Kitchen Renovations
A kitchen is where most Rockcliffe Park renovations start. We rework the layout, open the wall to the dining room where the structure allows it, and plan cabinetry, counters, and lighting around how you cook. Moving the sink or adding an island brings plumbing and electrical with it, so the drawings, the permit where one is needed, and the licensed trades are all part of the same contract.
Kitchen renovationsBathroom Renovations
Family bathrooms, primary ensuites, tub-to-shower conversions, and basement bathrooms. We plan the layout and the plumbing together, waterproof the shower before the tile goes on, and handle the permit when plumbing is altered or extended. Bathroom renovations in Rockcliffe Park are run by one project manager from demolition to the last fixture, so you are never coordinating a plumber, a tiler, and an electrician yourself.
Bathroom renovationsBasement Renovations
A finished basement adds living space to a Rockcliffe Park house without changing its footprint. We start with moisture and drainage, then plan the rooms: a rec room, a bedroom with an egress window, a bathroom, or a full secondary suite with its own entrance. Ceiling height, the furnace and ductwork, and where the plumbing can drain all shape the layout, and we design around them before anything is framed.
Basement renovationsHome Additions
When the house has run out of room, an addition can be the alternative to moving. We design rear and side additions, second storeys, and sunrooms in Rockcliffe Park to match the existing house, with the zoning review, engineering, and building permit handled before construction starts. Foundations, rooflines, and how the new space joins the old one are worked out on paper first.
Home additionsWhole-Home and Main-Floor
Opening up walls, reworking a main floor, or renovating the whole house at once, with the structure engineered and permitted properly and one schedule for every trade.
See a main-floor renovationHeritage Homes
Exterior changes in a heritage conservation district need City heritage approval on top of the building permit. We plan the design and the application together, so the approval is part of the schedule.
Heritage home renovations
What Rockcliffe Park Homes Ask For
How the heritage district shapes a renovation here.
The whole former village of Rockcliffe Park is a heritage conservation district under By-law 97-10. A heritage permit is needed before altering or demolishing, and it is separate from the building permit. Read our guide to heritage permits in Ottawa.
City heritage approval applies to exterior alterations: additions, windows, porches, and anything else that changes how the house meets the street. Interior work generally does not need it, which is why kitchens and bathrooms move faster than an addition.
An addition here is designed to fit the house and the streetscape, and the heritage permit comes before the building permit. We prepare both and plan the timeline around them.
If your house dates from before the 1940s, knob-and-tube wiring may still be in the walls, since it was installed from the early 1900s to the 1940s. Where it is, replacing it becomes part of the renovation.
Recent Renovations by OGC
Kitchens, bathrooms, basements, additions, and whole-home renovations, completed by OGC across the Ottawa area.
Why Rockcliffe Park Homeowners Choose OGC
Looking for a general contractor in Rockcliffe Park who designs and builds under one roof? OGC has 200+ verified reviews across Google, Houzz, and HomeStars.
True Design-Build, One Roof
Design, engineering, permits, and construction all live in-house. No finger-pointing between a designer and a builder, just one accountable team.
One Dedicated Project Manager
A single project manager runs your renovation from start to finish and stays reachable by phone or text the whole way through.
See It Before We Build It
Every renovation starts with drawings and 3D renderings, so you can see the finished space before a wall comes down.
Fixed Pricing, No Surprises
What you are quoted is what you pay, with the scope set in writing before work starts and a price-match guarantee on comparable quotes.
A 7-Year Warranty
Every OGC renovation is backed by our 7-year warranty. The full terms are on our warranty page.
Recognized by the Industry
OGC is a member of the Greater Ottawa Home Builders' Association (GOHBA) and the Canadian Home Builders' Association (CHBA), and a RenoMark renovator. Our work has been covered on CTV and CBC.
Rockcliffe Park Renovation Questions
It depends on what changes. The City of Ottawa requires a building permit to add or remove walls, create or enlarge a window or door opening, make structural repairs or foundation and drain tile repairs, and alter, add, or extend plumbing. Swapping fixtures in the same place and cosmetic work generally do not need one. Electrical work is separate: it is reported to the Electrical Safety Authority through a notification of work by a Licensed Electrical Contractor, and inspected before it is covered. OGC prepares the drawings, applies for the permit, and books the inspections. See our guide to electrical permits.
Yes. Bathroom renovations in Rockcliffe Park are run by the same team as every other project: the layout, the plumbing, waterproofing, tile, and the building permit where plumbing is altered or extended. Replacing fixtures in place generally does not need one. See our bathroom renovations page, and our guide to bathroom renovation permits.
Usually two. The whole former village is a heritage conservation district under By-law 97-10, so exterior alterations and demolition need a heritage permit from the City. Separately, structural changes and plumbing work need a building permit. Interior-only work generally needs no heritage approval. See our heritage home renovations page.
Yes, with a heritage permit first. An addition in the district is designed to suit the house and the street, and the heritage approval comes before the building permit. A renovation contractor in Rockcliffe Park should plan both into the schedule from the start, and we do. See our home additions page for the options.
It depends on scope far more than square footage. Scope and structure come first: whether walls, plumbing, or windows move. Then the systems an older house needs brought up to date, and then the finishes you choose. We give you a fixed price once the design is set. For detail by project, see our cost guides for kitchens, bathrooms, basements, and additions.
Also Renovating Near Rockcliffe Park
OGC renovates homes across Ottawa from our office on Merivale Road. Nearby, we also renovate in The Glebe, Orleans, and Gloucester. See our main Ottawa home renovations page, or pick another area.
no-obligation quote
.png)
Visit us
1886 Merivale Road #200, Nepean, ON K2G 1E6Sit with a specialist and visit our design center.







.png)